Westador Municipal Utility District- Alerts

Home/Harris County/Westador Municipal Utility District/Westador Municipal Utility District- Alerts
Westador Municipal Utility District- Alerts2022-02-28T15:50:39-06:00

Text Alerts

For Text Alerts, text WMUD to (866) 551-0666 to receive important news and updates from Westador Municipal Utility District via text messages.

Message and data rates may apply. To unsubscribe, text STOP to (866) 551-0666. For help text HELP anytime. Available in USA. Your privacy is always protected and your information will not be shared.

Email Alerts

For Email Alerts, please complete the form below.

Subscribe

* indicates required











Alerts

NHCRWA implements Stage 2 of the Drought Contingency Plan

The City of Houston (COH), the primary source of water for the North Harris County Regional Water Authority (Authority), has entered stage two of their Drought Contingency Plan, effective on August 27, 2023. The COH’s drought response calls for mandatory water conservations efforts to reduce water use, that will reduce the daily volume of water delivered. The Houston Public Works Release can be found under https://cityofhouston.news/stagetwodrought/.

As required by the Authority’s Drought Contingency Plan, the Authority must enter Stage 2 of our Drought Contingency Plan, when the COH enters into Stage 2 water shortage of their Drought Contingency Plan. The Authority’s Drought Contingency Plan requires that any customer receiving water from the Authority or well owner whose well is included under the Authority’s Harris-Galveston Subsidence District aggregate water well permit:

  • Repair detectible water leaks within 72 hours of discovery;
  • Utilize water conservation measures such as displacement bags, low-flow shower heads and leak detection tablets;
  • Limit outdoor irrigation to the hours 7:00 p.m. and 5:00 a.m. of the following day on no more than two (2) days per week, in conformity with the following schedule (no watering on Mondays):
    • Sundays and Thursdays for single-family residential customers with even-numbered street addresses
    • Saturdays and Wednesdays for single-family residential customers with odd-numbered street addresses; and
    • Tuesdays and Fridays for all other customers

Compliance with the above requirements is mandatory.

A printable version of this notice can be found by visiting https://www.nhcrwa.com/2023/08/stage-2-dcp/

August 25th, 2023|Westador MUD|

Stage 1 of the Drought Contingency Plan

NHCRWA implements Stage 1 of the Drought Contingency Plan

Due to the issues at the City of Houston’s NEWPP, the Authority is experiencing difficulties in meeting the high demand under the extreme weather conditions.   The Authority is implementing Stage 1 of our Drought Contingency Plan immediately.  The Authority’s Drought Contingency Plan request that any customer receiving water from the Authority or well owner whose well is included under the Authority’s Harris-Galveston Subsidence District aggregate water well permit:

  • Check for and repair all leaks, dripping faucets, and running toilets.
  • Utilize water conservation measures such as displacement bags, low-flow shower heads and leak detection tablets. Additional water conservation tips can be found at irrygator.com;
  • Limit irrigation to no more than two days per week, between 7:00 p.m. and 5:00 a.m. following the schedules below:
    • Sundays and Thursdays for single family residential customers with even-numbered street addresses.
    • Saturdays and Wednesdays for single family residential customers with odd-numbered street addresses.
    • Tuesdays and Fridays for all other customers.
    • No watering on Mondays.

Compliance with the above recommendations is voluntary.

August 17th, 2023|Westador MUD|
View Archives

Go to Top